Monday, 13 July 2015

Little shop of horrors: Day 26

Today, as we are one week from the show. We went for our first full run of the show. I felt that we needed this a lot. Seeing as we had only practiced act 1 and 2 separately, it felt satisfying to be able to tie the story together. I went the whole time without my script and needed prompting only once. So, personally, I was very pleased at how confident I was with my lines. I think it all went very well. Everyone knew what thy were doing and there were minor errors throughout. So I think we can be pleased. One problem though. Remained to be closed for renovation, where the timing of the song changed and didn't fit what we are used to. In addition, myself and Meg need to go over call back in the morning with the music as the vamp we used was horrendously difficult to sing along to. Again, as I always say, live music would be a great help for us in terms of timing. The only thing we can do, as performers, is to know our songs perfectly.

No comments:

Post a Comment